- KNIA / KRLS - http://www.kniakrls.com -

Corps continues work on flood recovery projects

Posted By admin On June 29, 2009 @ 5:23 am In Today’s Local News | Comments Disabled

Many local flood recovery projects remain in the design phase, according to the U.S. Army Corps of Engineers. Lake Red Rock received $21 million in federal flood recovery funds. One of the projects currently under design is a makeover for North Overlook Beach. Lake Red Rock Assistant Operations Manager John Holt says survey crews have been on site collecting data. He says North Overlook will be upgraded to a high water beach with a modern bathroom.


Article printed from KNIA / KRLS: http://www.kniakrls.com

URL to article: http://www.kniakrls.com/2009/06/corps-continues-work-on-flood-recovery-projects/

Copyright © 2009 KNIA/KRLS. All rights reserved.