- KNIA / KRLS - http://www.kniakrls.com -

Pella School Board Moves on HVAC for Middle School

Posted By News On May 12, 2013 @ 6:27 am In Today’s Local News | Comments Disabled

The Pella School Board held a special session this past week. They reviewed plans and specifications for the Middle Schools HVAC repairs, adopted the form of the contract for those repairs, and adopted a hearing time and place for the proposed plans. Josh Neilson with Modus Engineering of Des Moines presented a proposed plan and budget for the repairs, which primarily concern the gym and wrestling room, which will involve replacing equipment that was installed in the late 1970’s or early 1980’s. Costs are estimated to be $348,000.


Article printed from KNIA / KRLS: http://www.kniakrls.com

URL to article: http://www.kniakrls.com/2013/05/pella-school-board-moves-on-hvac-for-middle-school/

Copyright © 2009 KNIA/KRLS. All rights reserved.