The Army Corps of Engineers reports that current work has finished on the Red Rock Dam and Highway T-15 over the bridge is open. The bridge had been closed since April 9th for continued work on the tainter gates. After the drawdown for repairs, the lake is now back to its normal level of 742 feet above sea level.

